How to Reduce Maximum Demand Charges
Maximum demand can be a large part of a heavy user’s bill. Here is what causes it, how to find your peaks, and what usually brings them down.
In depth
How to cut maximum demand charges in Zimbabwe: seven tactics that work
A factory can use the same energy every month and still get very different bills. The difference is often the demand charge. This article explains in plain terms how that charge is formed. It then sets out seven tactics that reduce it. It is written for plant managers, financial controllers and engineers who want savings without a big capital project.
How a demand charge is formed
The utility meter averages your power over a short interval, commonly fifteen or thirty minutes. It records the highest value of the month. That highest average is your maximum demand: the highest average power you draw over a short interval. One short peak can set this charge for the whole month. It is billed at a rate per unit of demand, however briefly it lasted. So two plants that use the same energy each month can pay different amounts.
The reason is physical. The network, the transformer and the cables must be sized for the highest power you can ask for, even if you ask for it rarely. The demand charge pays for keeping that capacity ready for you.
Demand, explained
Demand is not the power at one instant. It is the average power over a fixed interval chosen by the utility. The charge is set by the highest interval in the month. So a spike that lasts less than the interval is partly averaged away. A longer interval is kinder to a plant with brief peaks. Our guide to power factor explains how power is measured in kW and kVA.
A worked example
Say a plant averages 400 kVA. Twice a week, three large compressors and a chiller start together, and the meter records 520 kVA. For this example, use the 11 kV capacity charge in the December 2023 ZETDC schedule, US$10.18 per kVA. The billed demand is 520 kVA, so the charge is US$5,294. Now suppose the starts are put in order and the peak falls to 440 kVA. The charge becomes US$4,479.
Read the full guide: How to cut maximum demand charges in Zimbabwe: seven tactics that workAlso covered: Peak shaving, with numbers · Seven tactics, in order of cost · What to protect while you reduce demand
What you get
Find your peak, then bring it down
See what sets your peak
Which machines push your demand up, when, and why. We read your demand pattern and trace each peak to its source.
Simple fixes
Staggered starts, better scheduling and power-factor correction. If low power factor is costing you, we size the fix and show the payback.
Savings you can check
An estimate you can compare with your ZESA bills, and a check of the bill against your tariff and meter readings.
Deliverables
What lands in your inbox
- Review of your tariff and bill
- Demand pattern and peak analysis
- Power-factor check and correction sizing
- Load-shifting recommendations
- Savings estimate with assumptions stated
Power-quality loggingBefore the call
What to bring
Rough information is fine. This is what lets us scope and quote quickly.
- 12 months of bills showing maximum demand (kVA) and tariff class
- Operating hours and shift pattern
- A list of large motors and when they start
- Any generator or solar already on site
How we work
From first message to finished work
- 1
Brief
A short call or message. Tell us about your site, your deadline and what is at stake. We reply within one working day.
- 2
Scope & fixed quote
We agree exactly what we will deliver, what we need from you, the timeline and a fixed price, before any work starts.
- 3
Engineer & document
We study your data, test the options and write the report or application, with every assumption stated.
- 4
Hand over & support
You get the finished package and a walk-through. We stay available while it is reviewed, approved or built.
Questions we hear
Before you book
Do I need special meters?
Not to start. Twelve months of bills gives a first view. Half-hourly data makes it sharper. If you have none, we plan a short logging period.
Will this stop production?
No. The aim is to move or smooth your load, not cut your output.
Do you install equipment?
No. We design and specify, review quotes and check the work. That keeps our advice independent.
Keep reading
The full guide, in plain English
Guide Tariffs · 7 min read
How to cut maximum demand charges in Zimbabwe: seven tactics that work
A maximum-demand charge turns a few minutes of peak load into a cost for the whole month. Here is how the charge is formed and seven engineering tactics that lower it.
How a demand charge is formedDemand, explainedA worked examplePeak shaving, with numbersSeven tactics, in order of costWhat to protect while you reduce demand
Read the full guide
More guides that go with this page
Power quality · 11 min readPower factor correction in Zimbabwe: stop paying for reactive powerRead the guide
Tariffs · 10 min readZimbabwe electricity tariffs explained: maximum demand, power factor and how to cut your billRead the guide
Billing · 11 min readHow to read a ZETDC bill line by line and spot what to challengeRead the guide
Talk to an AVEX GRID consultant
Have a project in mind, or want a second opinion on a quote you have received? Send us a short message and we will reply within one working day.