Zimbabwe electricity tariffs explained: maximum demand, power factor and how to cut your bill
Two factories can use the same units and get very different bills. The difference is how the load behaves, and an engineer can change that.
In this article
- Four terms, explained before we use them
- How an industrial electricity bill is built
- The rates on the official schedule
- Why maximum demand costs more than people expect
- Power factor: the quiet penalty
- Six ways to bring the bill down, in a sensible order
- A seven-point check of your latest bill
- What an engineer adds
Key points
- Your industrial bill has three parts you can influence: the energy charge, the maximum demand charge and the reactive power charge.
- One short peak can set the demand charge for the whole month. Starting several big motors together is the usual cause.
- ZETDC charges for reactive energy once it passes 33% of the active energy. That is a power factor below about 0.95 (the old 2020 rule was 48%).
- The rates here are from the ZERA-approved schedule of 1 December 2023. Tariffs change, so always work from your latest bill.
- Start with the cheap fixes: staggered starts and power factor correction. Solar and batteries can then help cap the peak.
津巴布韦电价详解:最大需量、功率因数与降低电费的方法
- 工业电费中企业可以控制的有三部分:电量电费、最大需量电费和无功电费。
- 一次短暂的峰值就可能决定整个月的需量电费,多台大电机同时启动是最常见的原因。
- 根据2023年12月1日起生效的ZERA批准电价表,无功电量超过有功电量的33%(即功率因数低于约0.95)时收取无功电费(2020年旧规为48%)。
- 电价会调整,上述数字来自2023年12月电价表,请以最新账单上的数字为准。
- 成本最低的措施(错开启动、功率因数补偿)应优先实施;之后可用光伏加储能压低峰值。
- AVEX GRID 可审阅您12至24个月的电费账单,找出节省空间并按回收期排序(可远程、英文沟通)。
联系方式:WhatsApp +7 900 131 7406,邮箱 inquiries@avexgrid.com。
Do you pay the Zimbabwe Electricity Transmission and Distribution Company (ZETDC) on a maximum-demand tariff? Then your bill is not just "units used". It has three parts that move separately, and most plant managers watch only one of them. This guide explains how the bill is built, what we know about current rates, and the steps that bring the number down. It is written for factory, mine, farm, hotel and property managers, and for investors who need to budget running costs in Zimbabwe.
Four terms, explained before we use them
Tariff language mixes quantities that sound alike. Energy is an amount, such as the units your meter counts. Demand is how hard you pull on the grid, averaged over a short time. Reactive energy is a third quantity that does no useful work. Power factor is the ratio that links them. It tells you how much of the power you draw is actually useful. A figure of 1.00 is perfect, and motors, transformers and welders pull it down. A low figure costs you extra. Clear definitions stop most billing arguments. There is more background in our guide to power factor, including how the three kinds of electrical power are worked out.
| Term | In plain words | Where it shows on the bill |
|---|---|---|
| Energy (kWh) | The units your meter counts | The energy charge |
| Maximum demand (kW or kVA) | Your highest short-term pull on the grid in the month | The demand or capacity charge |
| Reactive energy (kvarh) | Energy that does no useful work but loads the network | The reactive charge, only when it is too high |
| Power factor | How much of what you draw is useful. 1.00 is perfect | Not billed directly. It drives the demand and reactive lines |
How an industrial electricity bill is built
Large customers are normally billed on a maximum-demand (MD) tariff. Your meter records two main things: how much energy you use, and how hard you pull on the network at your worst moment. It also measures reactive power.
| Bill component | What it measures | What drives it | How it is reduced |
|---|---|---|---|
| Energy charge (US cents per kWh) | Total energy used, often split into off-peak, standard and peak periods | Production volume, equipment efficiency, when you run | Efficiency upgrades, shifting load to cheaper periods, on-site solar |
| Maximum-demand charge | Your highest demand in the month, in kW or kVA | How many large loads run or start at the same time | Staggered starts, soft starters and drives, load control, storage |
| Reactive-energy charge | Reactive power above an allowed share of active energy | Low power factor from motors, transformers, welders and lightly loaded equipment | Power-factor correction, right-sizing motors |
Most people think of the energy charge first. But for many plants, the demand and reactive parts are where an engineer finds money fastest. They respond to how you run your equipment, not to how much you produce.
The rates on the official schedule
The Zimbabwe Energy Regulatory Authority (ZERA) approves the tariff, and ZETDC publishes it. The schedule in force is "Electricity Tariffs as at 1 December 2023". For maximum-demand customers in mining, industry, commerce and pumping works it reads as follows, in US dollars before the 6% levy and 15% VAT:
| Charge | Rate |
|---|---|
| Fixed charge | US$7.93 a month |
| Capacity charge, per unit of demand | US$11.73 at 0.4 kV, US$10.18 at 11 kV, US$7.49 at 33 kV |
| Energy, on-peak | US$0.24 per kWh |
| Energy, standard | US$0.13 per kWh |
| Energy, off-peak | US$0.08 per kWh |
| Reactive energy | US$0.052 per kvarh above 33% of the kWh |
This is a time-of-use tariff. On a weekday, off-peak is 00:00 to 06:00 and 22:00 to midnight, on-peak is 07:00 to 11:00 and 17:00 to 20:00, and the hours between are standard. Saturday and Sunday have shorter on-peak periods, and Sunday and public holidays have no morning peak. If your split is 25% on-peak, 50% standard and 25% off-peak, the blended energy rate is about US 14.5 cents per kWh. The schedule does not say whether the capacity charge is per kW or per kVA. kVA is usual on these bills, so confirm the unit on yours.
If you earn foreign currency
ZETDC also publishes a separate schedule for exporters and forex earners, dated 20 October 2023 and approved by ZERA. For maximum-demand customers it is cheaper than the ordinary one, and it has no fixed charge:
| Charge (US$) | Ordinary, 11 kV | Exporter, mining and industrial, 11 kV | Forex earner, industry and farming, 11 kV |
|---|---|---|---|
| Fixed charge a month | 7.93 | 0.00 | 0.00 |
| Capacity charge per unit of demand | 10.18 | 9.56 | 7.49 |
| Energy: on-peak, standard, off-peak per kWh | 0.24, 0.13, 0.08 | 0.22, 0.12, 0.07 | 0.18, 0.10, 0.05 |
| Reactive energy per kvarh | 0.052 | 0.05 | 0.052 |
The schedule does not say who qualifies or what proof ZETDC wants, and it says its prices are reviewed monthly. If you export or earn foreign currency, ask ZETDC in writing which schedule applies to you. Our calculator lets you load these rates from its tariff selector.
- Older figures you may still see. The November 2020 leaflet put the reactive threshold at 48% of active energy, and 2022 reports quoted about US$5.71 for demand and 6, 10 and 18 US cents for the time-of-use energy bands. Those are no longer the schedule.
- Not yet verified. We found no ZERA review that changed the industrial rates after December 2023, but ZERA said in October 2025 that the cost of electricity "will soon be adjusted". Always compare against your latest bill.
Calculated at the December 2023 rate; the charge applies on top of energy and reactive-energy charges. Source: ZETDC tariff schedule of 1 December 2023; AVEX GRID calculation.
Why maximum demand costs more than people expect
The demand charge is set by your highest demand in the billing month. Many schemes use a short averaging window, so a few minutes can be enough. Maximum demand is the highest average power you draw over a short interval. One short peak can set this charge for the whole month. ZETDC's published notices also say something else. If you reach your maximum demand off-peak, you are charged on the demand reached in the peak or standard period. So you cannot always hide a spike in the night.
A simple worked example shows the scale. A food-processing plant normally runs at 400 kVA. But twice a week, three large compressors and a chiller start together, and the meter records 520 kVA. Use the 11 kV capacity charge of US$10.18 per unit of demand:
The real number depends on your actual tariff and meter. But the logic holds for any maximum-demand customer. The money is in the peaks.
Power factor: the quiet penalty
Motors, transformers and welders draw reactive power as well as useful power. Reactive power is the power that motors and transformers use to build their magnetic fields. It does no useful work, but it still loads cables and transformers. The ratio between useful power and total power is the power factor. A low power factor makes the network carry more current for the same useful work, so the utility charges you for it. The December 2023 schedule says that reactive energy above 33% of active energy is charged at US$0.052 per kvarh. That share matches a power factor of about 0.95. (The 2020 leaflet used 48%, or about 0.90.)
The effect is double. You can pay a reactive-energy charge. A lower power factor also pushes up your apparent demand in kVA. Take a 100 kW load:
- At a power factor of 0.80 the demand is 125 kVA.
- At 0.95 it is about 105 kVA, roughly 20 kVA less.
- At US$10.18 per unit, that is about US$201 a month saved on demand alone. This is before you avoid any reactive-energy charge.
Capacitor banks are the usual fix. A capacitor bank is a set of capacitors that supply reactive power on site. This lifts the power factor and cuts the extra charge. But the bank must be designed with the harmonics in your plant in mind. Harmonics are distortion of the electrical waveform, caused by drives, LED lights and inverters. They heat equipment and waste power. On a site with many variable-speed drives, a bank without protection can resonate and damage equipment. That is why we measure power quality before we specify correction. See IEEE 519 and IEC 61000-4-30 for the measurement methods.
Six ways to bring the bill down, in a sensible order
- Read your own demand profile. Ask for the 15- or 30-minute interval data from the meter, or fit a logger. You cannot manage what you have not seen.
- Stagger large starts. A simple timer or sequence controller often removes the worst peaks at almost no cost.
- Fix power factor. Use correction sized to the measured load. Add detuning reactors where you have drives.
- Soften motor starts. Soft starters and variable-speed drives cut the starting surge. They also save energy on pumps and fans.
- Move flexible load. Water heating, ice making and batch processes can often run in cheaper periods.
- Add solar and, where it makes sense, storage. Solar cuts your energy cost during the day. Storage can cap the evening peak, which is where demand charges are usually set. A grid-impact study and a registration with ZERA come first.
A seven-point check of your latest bill
- Find the billed maximum demand and the date it happened. Was that a normal day?
- Compare it with your connected and contracted capacity. Are you paying for headroom you do not use?
- Check the power factor or reactive-energy line. Is any reactive charge appearing?
- Confirm your tariff class. Exporters and other foreign-currency earners have had different rates.
- Compare the off-peak, standard and peak split with your shift pattern.
- Check the meter multiplier and reading dates for errors.
- Keep 24 months of bills together. Patterns show up over a year, not a month.
What an engineer adds
An engineer does three things that a bill review alone cannot. We measure your load over a representative period. We model the effect of each fix before you spend money. And we check that the fixes do not cause new problems, such as harmonic resonance. The result is a ranked list of measures with cost, saving and payback. You can then decide what to do first.
What AVEX GRID can take off your hands
AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.
We quote fixed prices after a free scoping call and reply the same working day.
Frequently asked questions
What is maximum demand?
It is the highest power your site draws in a billing period, measured over a short interval. The utility charges for it because it must keep network capacity available for that peak.
Is the demand charge in kW or kVA?
The schedule does not say, and kVA is usual. Check the unit and the rate printed on your own bill, because the difference changes the saving from power-factor correction.
Does solar reduce the maximum-demand charge?
Only if solar output reliably coincides with your peak. A cloudy afternoon or an evening peak can still set the charge, which is why storage or load control is often added.
How much could my factory save?
It depends on your load shape and tariff. We do not quote a percentage in advance. After reviewing 12 to 24 months of bills and a short measurement period, we give a ranked list with cost and payback.
Is power-factor correction worth it?
Often yes, where the power factor is below about 0.95 (the point where the reactive charge starts) or the demand charge is large. It must be designed around the harmonics in your plant.
Sources and notes
General information to help you plan. The rules that apply to your site are confirmed by AVEX GRID against the current gazetted text, ZERA and ZETDC as part of the work. The sources used are listed below.
- IEEE Std 1459-2010: definitions for the measurement of electric power quantities
- Financial Gazette: Electricity tariff review on the cards (30 Oct 2025)
- Financial Gazette: ZERA targets cost-reflective power tariff (26 Oct 2023)
- Pindula: ZESA electricity tariffs effective 25 January 2024
- Equity Axis: CZI and ZETDC face off as power charges surge (2023)
- ZETDC: Electricity tariffs, exporters and forex earners, as at 20 October 2023
- ZETDC: Electricity tariffs as at 1 December 2023 (archived copy)
- Commercial Farmers' Union: ZESA tariff notice (2020, for the old 48% rule)
- IEEE 519 and IEC 61000-4-30 (harmonics and power-quality measurement standards)