SI 122 of 2026: What the Energy Management Regulations Mean for You

A plain-English guide to the new rules on managing electricity use: who they are likely to cover, what you need to do to comply, and how to get ready.

Share this service WhatsApp Email

In depth

SI 122 in ten steps: a compliance roadmap for facility managers

SI 122 of 2026 is the Electricity (Energy Management) Regulations. It was gazetted on 31 July 2026 and puts energy management duties on larger electricity users. This roadmap turns those duties into ten steps, in the order a facility manager would tackle them. For a full account of what an audit contains, see our audit guide.

12 monthsto file the policy for an existing facility
3 yearsmaximum interval between audits
50%of identified savings to be implemented in three years
01

Step 1: Decide whether your site is covered

The regulations apply to designated facilities. These are sites with at least 100 kVA of installed capacity. They also include maximum-demand customers of the utility. kVA is the size of the load on your supply, and transformers and generators are rated in it. If your bill shows a maximum-demand charge, assume the rules apply and plan for it. We confirm coverage for each site against the gazetted text.

02

Step 2: Appoint an accountable owner

Choose a senior person to own the programme, and a deputy. The regulations require a licensed energy manager and an energy-management committee. So decide early who will sit on the committee and who will be the manager.

03

Step 3: Collect your data

Gather 24 months of bills, fuel records, production figures and your equipment list. You must keep records of energy, fuel and water use for at least five years. So build one clean register now.

Read the full guide: SI 122 in ten steps: a compliance roadmap for facility managersAlso covered: Step 4: Write the energy-management policy · Step 6: Commission a licensed audit · Step 7: Turn findings into a three-year plan · Step 8: Implement at least half of the savings

What you get

Be ready before the deadline, not after

Know if it applies to you

A short check of your supply size, demand and records against the published rules.

Savings you can act on

Likely measures ranked by payback, so the plan pays for itself where it can.

Records in order

Bills, meter and load data sorted, so your licensed auditor can work quickly.

Deliverables

What lands in your inbox

  • Check of whether the rules apply to you
  • Review of your bills and demand
  • List of missing data and meters
  • Draft investment plan in stages
  • Briefing for your board
An engineer with a tablet beside motors, drive cabinets and a compressor in a processing plantMotors and compressed air

How we work

From first message to finished work

  1. 1

    Check if it applies

    We compare your supply capacity and demand with the published rules and tell you what is likely to apply.

  2. 2

    Collect the data

    Bills, demand data, a list of your big loads and your meters. We give you a simple checklist.

  3. 3

    Find the savings

    We study the data and rank the measures by payback.

  4. 4

    Plan and hand over

    You get a plan in stages and a briefing, ready for your licensed auditor or energy manager.

Questions we hear

Before you book

Does this apply to my business?

It is reported to apply to facilities of at least 100 kVA and maximum-demand customers. Confirm against the gazette text. We can help you do that.

Can you carry out the licensed audit?

Audit work is licensed. We provide readiness support and work with your licensed auditor. We will never call readiness work a licensed audit.

What if the rules change?

They may. We update this page and your plan when the official text or guidance changes.

Standards & tools our work is prepared to
IEC 60909 IEEE 1584 IEEE 519 IPMVP ISO 50001 ETAP ZERA Grid Code

Talk to an AVEX GRID consultant

Have a project in mind, or want a second opinion on a quote you have received? Send us a short message and we will reply within one working day.