School buildings with rooftop solar panels
Education10 November 2026·7 min read

Schools and universities: reducing the electricity bill and keeping classes running

A school has a predictable day, many buildings and a tight budget. Electricity is one of the few costs you can cut without hurting teaching.

In this article
  1. What a school's energy bill is made of
  2. The supply is changing
  3. Meter by building
  4. The measures that usually pay first
  5. Solar on school roofs
  6. Electrical safety and reliability
  7. The regulatory position
  8. How AVEX GRID helps

Key points

  • In the US, heating, cooling and lighting are nearly 70% of a school's energy. In Zimbabwe it is lighting, hot water, kitchens and pumping.
  • Government reported in 2026 that about three-quarters of schools have power, with all rural schools targeted by 2027.
  • Put a sub-meter on each building. It shows where the energy goes and who is responsible.
  • Big flat roofs and daytime loads suit solar well. Some African school projects were paid for through leases over twenty years.
  • A campus with 100 kVA or more of supply is a designated facility under SI 122 and has the same duties as a factory.

People rarely think of schools as big energy users. But a boarding school, a technical college or a university campus is in effect a small town. It has housing, kitchens, laundries, workshops, laboratories, libraries, sports facilities and a water supply. All of it runs on a single electricity account. The leaders of these institutions usually know the size of the bill. Few know what is in it.

What a school's energy bill is made of

The best-known benchmark comes from America. The United States federal government states that space heating, cooling and lighting make up nearly 70% of the energy used in schools. A Department of Energy buildings data book gives shares of 47% to heating, 14% to lighting, 10% to cooling and 4% to computers.

These figures come from a cold climate. You cannot copy them straight to Zimbabwe, where heating is a minor load and the pattern is different. A careful engineer uses them as a reminder. A few systems dominate energy use in a school, and the rest is a long tail.

In a Zimbabwean day school, the main loads are lighting and a small amount of information technology. Where it is available, there is also ventilation and pumping. In a boarding school or hostel, the energy use shifts strongly to the evening and night. The biggest loads become the kitchen, the hot-water system and the laundry. In a university, laboratories, workshops, server rooms and air conditioning for lecture halls add to the list. One thing they share is that the pattern follows the timetable. That makes it predictable, and so possible to manage.

The supply is changing

Government reports in 2026 say about three-quarters of Zimbabwean schools now have electricity. Rural primary schools are at about 71% to 75%, and rural secondary schools are somewhat higher. The Rural Electrification Agency has set a target of reaching all rural institutions by 2027. Sources differ by several percentage points, so treat the numbers as approximate.

In practice, many schools are moving from having no electricity to having a connection. For these schools, the first electricity bill is a big event. Plan ahead for the load. Also plan what the school will do when the grid fails. This avoids costly corrections later.

Where a school's energy goes: United States benchmarkShare of school energy use, percent
47%space heating
  • Space heating47%
  • Lighting14%
  • Cooling10%
  • Computers4%
  • Other25%

US data. Heating is a minor load in Zimbabwe, so lighting, hot water, kitchens and pumping weigh more here. Source: US Energy Information Administration, Commercial Buildings Energy Consumption Survey (compiled in the DOE Buildings Data Book)

Meter by building

A single meter on the main supply hides the information a school needs. Fit sub-meters on the major buildings of the campus. These are the kitchen, the hostels, the library, the workshops, the water plant and the administration block. A member of staff can read the meters each month. Or you can connect them to a simple logging system that reports use automatically.

The data show which building has an unusual pattern. They also show where use carries on overnight or during holidays, when it should be low. Sub-metering also ends arguments inside an institution about who should pay. It supports fair charging to staff housing and to commercial tenants such as bookshops and canteens. The numbers are only as good as the meters, as our article on meter verification explains.

The measures that usually pay first

Four kinds of measure appear in nearly every campus audit.

Lighting comes first. Replace fluorescent and old bulb fittings with LEDs. A LED, or light-emitting diode, gives the same light as older bulbs for a fraction of the power. Add timers or presence sensors in corridors, halls and toilets. This gives a large cut in a load that runs for long hours.

Hot water comes second. Boarding kitchens and hostels often use electric elements that stay on for most of the day. Solar water heaters or heat pumps, with timers or thermostats, can replace much of this load.

Pumping is third. Borehole and water-supply pumps often run for long hours at a bigger capacity than they need. The right size, tank-level control and solar pumping all cut the cost.

Fourth are computers and plug-in equipment. You can manage these with simple rules and with equipment that sleeps when not in use.

Solar on school roofs

School roofs are large, flat and rarely shaded. The main teaching load runs in daylight. So a photovoltaic (solar) array can send most of its energy straight to the school without storage.

African examples show how the finance can work. A primary school in Knysna, South Africa, was reported to expect savings of about R1.57 million over a twenty-year lease. A school in Limpopo expected solar to replace about 40% of its energy use. The economics of each project depend on the tariff and the fixed charges), the load and the lease terms. But the structure is useful. The school pays no capital, the saving covers the lease payment and the surplus stays with the school.

Boarding schools need extra care. The evening load is large and there is no sun then. A battery can carry part of the evening load, but it is costly. So first size the array for the daytime load the school has. The grid or a generator keeps carrying the evening. For a day school with little evening use, the array can often cover most of the yearly consumption.

Electrical safety and reliability

Campuses grow by addition. New classrooms and hostels are connected to a distribution system designed for a smaller load. Overloaded cables, loose connections and old boards are a fire risk. They also cause power cuts in the middle of term. A thermal survey and an inspection of the distribution boards find these problems before they do harm.

Some work depends on a steady supply, such as examinations or laboratory work. Protect it with a small UPS and a generator for the essential circuits. A UPS is an uninterruptible power supply, a battery unit that keeps equipment running during a power cut. This protects work that cannot be repeated.

The regulatory position

The Electricity (Energy Management) Regulations, SI 122 of 2026, define a designated facility. SI means statutory instrument. A site is designated if it has 100 kVA or more of installed capacity. It is also designated if it is a maximum-demand customer of the utility. kVA is the size of the load on the supply, and transformers and generators are rated in it. A university, a large boarding school or a college is likely to qualify.

A designated facility must file an energy-management policy. It must commission a licensed audit at least every three years. It must prepare an investment plan and report every year.

The records from sub-metering, and from a baseline audit are exactly what the regulations ask for. A baseline is the starting point you measure savings against. So the work you do to save energy also helps with compliance.

How AVEX GRID helps

  • Campus energy review. We read your bills, specify the sub-metering and rank the measures by return.
  • Solar and battery design. We size the system to the daytime and boarding loads and set out the options for purchase, lease or power purchase agreement.
  • Funding-ready study. We prepare the technical document that donors, boards and lenders ask for.

What AVEX GRID can take off your hands

AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.

Feasibility and bankable studiesYield, load and hybrid models, and the technical file lenders and ZERA read.
Power-system engineering (ETAP)Load flow, short circuit, arc flash and protection studies for approvals and safe design.
Licence and PPA technical supportZERA licence documents, ZETDC connection studies, PPA technical schedules.
Owner's engineerDesign review, testing and commissioning on your side of the EPC table.
Tariff, audit and compliance workMaximum-demand and power-factor savings, readiness for energy-management rules.
Remote plus on the groundModelling for overseas teams, with an engineer in Zimbabwe for site, utility and regulator work.

We quote fixed prices after a free scoping call and reply the same working day.

Frequently asked questions

What is the best first step for a school?

Read twelve months of bills and meter the main buildings. That shows where the money goes before anything is bought.

Can solar run a school without the grid?

Many day schools can run most of their daytime loads on solar and use the grid or a generator for the rest. Boarding schools need more storage or a generator for the evening load.

Does SI 122 apply to my school?

It applies if the site has 100 kVA or more of supply or is a maximum-demand customer. We check each campus individually.

How do we pay for it?

Through grants, savings from the bill, leases or a power purchase agreement. A technical study is the basis for each route.

Topics: school solar Zimbabweuniversity energy efficiencyboarding school electricityschool electrification Zimbabwecampus energy auditeducation energy savingrooftop solar schoolsenergy consultant Zimbabwe

Sources and notes

General information to help you plan. The rules that apply to your site are confirmed by AVEX GRID against the current gazetted text, ZERA and ZETDC as part of the work. The sources used are listed below.

DJ

Devine Tafara Javangwe is the founder and lead consulting engineer at AVEX GRID. He holds an MSc in Electrical Power Engineering (Southern Federal University, 2025), is a Professional Member of the Zimbabwe Institution of Engineers and an IEEE member.

About the practice · Contact

Put the savings back into teaching.

Send us your latest electricity bill and the number of buildings. We return a plan with the saving, the cost and the funding route.

+263 78 488 9775 · Autherstone Street 21, Marondera, Zimbabwe · Remote across Southern Africa