  1. The scale of the problem
  2. Classifying loads by what they can tolerate
  3. Building the backup chain in layers
  4. Protection and earthing in medical locations
  5. The role of solar and storage
  6. Testing, maintenance and records
  7. How AVEX GRID helps

Key points

  • A 2023 report by the WHO, World Bank, IRENA and SEforAll found that about one billion people use health facilities with no or unreliable power.
  • In sub-Saharan Africa few facilities have reliable power. The result is spoiled vaccines, interrupted surgery and unsafe births at night.
  • IEC 60364-7-710 classifies medical locations and sets the maximum time in which a backup supply must take over for each class.
  • Backup is built in layers: uninterruptible power for the most critical loads, a generator for essential loads, and load shedding for the rest.
  • Solar and storage cut running cost and generator hours. They add to the backup chain and never replace it.

Hospitals are among the most demanding of all electrical installations. Their loads range from the sensitive electronics of an intensive-care unit to the heavy motors of a laundry. They work every hour of the year. They treat patients whose lives may depend on a steady supply. At the same time, many health facilities in the region work on a weak grid and a tight budget. So the electrical design has to be both rigorous and economical.

The scale of the problem

In January 2023 the World Health Organization, the World Bank, the International Renewable Energy Agency and Sustainable Energy for All published Energizing Health: Accelerating Electricity Access in Health-Care Facilities. The report estimated that close to one billion people are served by health-care facilities with no electricity or an unreliable supply. In sub-Saharan Africa, only about four in ten facilities were found to have a reliable supply.

The report links these figures to real harm. Vaccines and medicines spoil without refrigeration. Surgery and deliveries are done by torchlight. Diagnostic equipment cannot be used.

Zimbabwe is not outside this picture. Rural clinics that depend on a single weak power line face the same technical problem as urban hospitals that suffer planned and unplanned power cuts, only at a different scale. The answer starts with one idea: not all loads in a health facility are equal.

Health-care facilities in sub-Saharan Africa by electricity supplyShare of facilities, percent
40%reliable supply
  • No electricity15%
  • Unreliable supply45%
  • Reliable supply40%

WHO reports about 15% with no electricity and about 40% with a reliable supply; the unreliable share is the remainder. Source: WHO, Energizing Health (2023)

Classifying loads by what they can tolerate

The international standard for the electrical installation of medical locations is IEC 60364-7-710. IEC is the International Electrotechnical Commission, which writes international standards for electrical equipment. The standard sorts rooms by how they are used and by what happens if supply is lost. Some locations have no clinical problem if the power breaks. Others can accept a short break. Others, such as operating theatres and intensive-care rooms, need the supply restored almost at once.

For the most critical loads, the standard requires a backup supply to take over within a fraction of a second. For essential safety services it requires fifteen seconds. So no single backup device can serve every load. The design must give different speeds of recovery to different classes of load.

A simple way to think about the facility is in four groups.

  • Life-critical loads, such as operating-theatre lighting and life-support equipment, cannot tolerate any break.
  • Essential loads, such as emergency lighting, labour wards, refrigeration for blood and vaccines and key communications, can tolerate a gap of seconds.
  • Important loads, such as imaging, sterilisation and kitchens, can wait minutes for a controlled restart.
  • General loads, such as offices and laundry, can be switched off during a power cut.

Sorting the facility this way is the first and most valuable step in the design. It decides how much of each type of backup you need.

Building the backup chain in layers

The first layer is a UPS. It is a battery unit that carries the most critical loads with no break while the next layer starts. Size the UPS for the load it carries and for the time the generator needs to start and take over. Allow for the batteries ageing. At many sites, lithium batteries behind inverters can do the same job. They take less space and last through more cycles than lead-acid batteries.

The second layer is a generator with an automatic changeover switch. This switch moves your supply from the grid to the generator when the power goes off, and back again. It moves the essential board to the generator within seconds of a grid failure. Size the generator for more than the running load of the essential board. It must also handle the starting current of the largest motors, such as compressors, pumps and lifts. The starting current is the big surge of power a motor pulls for a moment when it switches on.

Undersizing for starting current is a common failure. The generator starts, but the voltage collapses when the compressors try to start together. So the design should start the motors one after another. It should also use soft starters or drives on the largest motors.

The third layer is deliberate load shedding, which means switching off some loads on purpose. If the generator or batteries cannot carry the whole facility, the control system drops general loads first, then important loads. This keeps the capacity for the loads that matter most. Without it, an overload can cause a total failure.

Protection and earthing in medical locations

Patients who are connected to electrical equipment are far more at risk from electric shock than healthy people. Small currents applied directly to the body can cause fibrillation, a dangerous heart rhythm. So medical locations use extra protection. This includes equipotential bonding, which keeps all metal parts at the same voltage. In the most critical rooms it includes isolated supplies with insulation monitoring. Elsewhere it includes residual-current protection, which cuts the power in a fraction of a second if current leaks to earth, for example through a person.

A protection coordination study sets breakers and relays so that the one nearest a fault trips first. That way a fault does not trip a whole board. An arc-flash assessment protects staff who work on the switchgear. Switchgear means the switches, fuses and circuit breakers that control and protect an electrical supply. These studies are rarely the most visible part of a hospital project. But they stop a local fault from becoming an outage across the whole facility.

The role of solar and storage

For many facilities, the highest running cost of power is the fuel and maintenance of the generator. A solar array supplies the daytime load and cuts the grid and diesel bill. A battery system can carry the essential load through short power cuts. It also lets the generator run less often, and at a better load when it does run. The World Health Organization and its partners see solar supply as a practical route for facilities with a weak grid or none.

The engineering rules are simple.

  • Solar and storage are an addition to the backup chain. The chain must stay complete without them.
  • The inverters and controls must work with the generator. They must not feed power back into it or upset it.
  • Size the battery for the critical load and the outage time, not for the whole building.
  • Clinical staff must not need to act in an emergency. The transfer must be automatic.

Our guide to sizing solar plus battery explains the method. Our article on diesel cost shows how to calculate the saving.

Testing, maintenance and records

A backup system is only as good as its last test. Run generators on load at set intervals. Do not just start them. Record the transfer time, voltage and frequency. UPS batteries lose capacity with age and heat. So test how long they last and replace them on schedule.

Scan switchboards and connections with a thermal camera each year. A loose connection is the commonest cause of an electrical fire. Keep records of these tests. They protect the facility with funders and inspectors. They also give management early warning when a system is declining.

How AVEX GRID helps

  • Critical load review. We classify the loads and set the backup level that each requires.
  • Backup and solar design. We size the UPS, generator, solar and storage to the clinical need and the budget, and we model the fuel saving.
  • Protection study and thermal survey. We check the switchboards, fault levels and coordination before a weakness becomes an outage.

What AVEX GRID can take off your hands

AVEX GRID is an engineer-led energy consultancy in Zimbabwe. We do the technical work that turns an energy investment into a plant that is licensed, connected, financed and performing, whether you are a local operator or an investor overseas.

Feasibility and bankable studiesYield, load and hybrid models, and the technical file lenders and ZERA read.
Power-system engineering (ETAP)Load flow, short circuit, arc flash and protection studies for approvals and safe design.
Licence and PPA technical supportZERA licence documents, ZETDC connection studies, PPA technical schedules.
Owner's engineerDesign review, testing and commissioning on your side of the EPC table.
Tariff, audit and compliance workMaximum-demand and power-factor savings, readiness for energy-management rules.
Remote plus on the groundModelling for overseas teams, with an engineer in Zimbabwe for site, utility and regulator work.

We quote fixed prices after a free scoping call and reply the same working day.

Frequently asked questions

Can a clinic run only on solar and batteries?

Small clinics often can, with a design sized to the critical load and the outage length and with simple provision for long cloudy periods.

How big should the generator be?

It is sized for the essential loads plus the starting current of the largest motors, with margin for growth. A load study gives the number.

How often should backup be tested?

On a set schedule, under real load, with the results recorded. Monthly runs are common, and the transfer time is recorded each time.

Does solar reduce the need for a generator?

It reduces how often the generator runs. The generator remains the backup for long outages and cloudy periods.

Topics: hospital backup power Zimbabweclinic solar powermedical locations IEC 60364-7-710UPS operating theatregenerator changeover hospitalhealthcare electrificationvaccine cold chain powerenergy consultant Zimbabwe

Sources and notes

General information to help you plan. The rules that apply to your site are confirmed by AVEX GRID against the current gazetted text, ZERA and ZETDC as part of the work. The sources used are listed below.

DJ

Devine Tafara Javangwe is the founder and lead consulting engineer at AVEX GRID. He holds an MSc in Electrical Power Engineering (Southern Federal University, 2025), is a Professional Member of the Zimbabwe Institution of Engineers and an IEEE member.

About the practice · Contact

Make the power supply as reliable as the care.

Send us the single-line diagram or a list of your critical loads. We return a backup plan with the sizes, the costs and the tests.

+263 78 488 9775 · Autherstone Street 21, Marondera, Zimbabwe · Remote across Southern Africa