Energy Consultancy

Maximum Demand (MD) Tariff Optimization

ZETDC charges crushing penalties to heavy industrial consumers who spike during peak hours. We audit your machines, reschedule, and save you thousands of USD per month — measured.

The pain

A single peak excursion can dominate the month’s MD charge. Most operators don’t realise which equipment caused it.

What we do

Sub-metered MD analysis, machine-level peak attribution, scheduling and soft-starter recommendations — with measured before/after savings on the bill.

Talk to an AVEX GRID consultant

Have a project in mind, or want a second opinion on a quote you’ve received? Send a short brief — we’ll come back within one working day.